J I N B A O R O N G

Please Wait For Loading

Loading Cancel.

Songgang Town, Bao'an, Shenzhen city, Guangdong, China +86-755-2706-5898 Email:info@j-mold.com

FAQ’S - Plastic Injection Molding Company Mold Tooling Manufacturer

The cost of manufacturing injection moulds depends on a very large set of factors ranging from number of cavities, size of the parts (and  therefore the mold), complexity of the pieces, expected tool longevity, surface finishes and many others.

     The initial cost is great, however the piece part cost is low, so with greater quantities the overall price decreases.

      With global competition, JBR with an ISO-Quality system usually will have better pricing as they have streamed lined their processes and produce less defect.

Quotation are provided within 48H receipt of RFQ.

Our design lead time is 2-4 days for DFM report initial 2D design, then 3-5 days for 3D design upon approval of 2D design.

Our common lead time from design approval to T1 sampling is 4-8 weeks, depending on mold requirements and part complexity.

Usually we use IMPAX718, STAVAX136, ORVAR8407, Groditz 2344, PX88, NAK80, SKD61, H13, P20, 420, 420SS, etc .

We quote the price on the basis of FOB Shenzhen.

The biggest mold we have built so far is 15tons with dimension of 2.0mX1.5mX1.2m mold.

Every month we can manufacture 20~25 sets of molds.

Yes, we have rich experiences and skillful techniques on those kinds of plastic injection molds.

Yes, we do. We use DME, Syventive, HASCO, Mold Master and YUDO hot runner system.

DXF, DWG, IGES, STEP, X-T, SAT, PRT, etc.

Usually we use DMEHASCOPARKERDAIDOLKM standards. Of course we will design the moulds as per customer's requirements.

For mold:

1. 50% for mould and 100% for hot runner Down payment with PO;         
 2. 30% upon presentation of parts from T1 sampling;       
 3. 20% upon approval to make parts or before shipping moulds.

For part:  1. 50% deposit with PO;       
                       2. 50% before delivery parts.

Yes, we do. Over 75% of our molds are exported.

We can make about 35 sets moulds every month.

We have about 100 employees now.

Our turnover in 2023 about 70 million RMB.